Experts in the Sales, Hire and Service of lifting, Winching, Jacking and Load Securing products to a wide range of markets and industries

Experts in the Sales, Service and Hire of a wide range of Lifting, Jacking and Materials Handling products to the rail industry.

Arbil 4x4 is dedicated to bringing you the best brands, best quality and best technical support to give you maximum off roading enjoyment.

 

Arbil Latest News

Safe use of slings

July 28th, 2010

When using slings you should be familiar with the safe use of slings. Slings should only be used by trained operatives who understand the methods of rating and application of mode factors:

<!– /* Font Definitions */ @font-face {font-family:”MS Mincho”; panose-1:2 2 6 9 4 2 5 8 3 4; mso-font-alt:”MS 明朝”; mso-font-charset:128; mso-generic-font-family:modern; mso-font-pitch:fixed; mso-font-signature:-1610612033 1757936891 16 0 131231 0;} @font-face {font-family:”\@MS Mincho”; panose-1:2 2 6 9 4 2 5 8 3 4; mso-font-charset:128; mso-generic-font-family:modern; mso-font-pitch:fixed; mso-font-signature:-1610612033 1757936891 16 0 131231 0;} /* Style Definitions */ p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-parent:”"; margin:0cm; margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:12.0pt; font-family:”Times New Roman”; mso-fareast-font-family:”MS Mincho”;} @page Section1 {size:595.3pt 841.9pt; margin:72.0pt 90.0pt 72.0pt 90.0pt; mso-header-margin:35.4pt; mso-footer-margin:35.4pt; mso-paper-source:0;} div.Section1 {page:Section1;} –>

  • Good slinging practice must ensure that the load is as safe and secure in the air as it was on the ground and that no harm is done to the load, lifting equipment, other property or persons.
  • Establish the weight of the load, ensure the lifting method is suitable and inspect the sling and attachments for obvious defects. Prepare the landing area  making sure the floor is strong enough to take the load. Follow any specific instructions from the supplier.
  • Ensure the lifting point is over the centre of gravity. Any loose parts of the load should be removed or secured. Secure the sling firmly to the load by hooks onto lifting points or shackles etc. The sling must not be twisted, knotted or kinked in any way.
  • Use packing to prevent damage to the sling from corners or edges and to protect the load.
  • Do not exceed the SWL or rated angle. Any choke angle must not exceed 120° and any basket 90°.
  • Do not hammer, force or wedge slings or accessories into position; they must fit freely.
  • When attaching more than one sling to the hook of the appliance use a shackle to join the slings and avoid overcrowding the hook.
  • Use an established code of signals to instruct the crane driver.
  • Ensure the load is free to be lifted and not, for example, bolted down.
  • Check that there are no overhead obstacles such as power lines.
  • Keep fingers, toes etc clear ensuring they do not become trapped when lifting, lowering or controlling loads.
  • Make a trial lift by raising the load a little to ensure it is balanced, stable and secure and if not lower it and adjust the slinging arrangement.
  • Where appropriate use tag lines to control the load.
  • Except where special provision is made, do not allow anyone to pass under or ride upon the load. The area should be kept clear.
  • Make a trial set down, ensure the sling will not become trapped and the load will not tip when the slings are released. Use supports which are strong enough to sustain the load without crushing.
  • Never drag slings over floors etc or attempt to drag a trapped sling from under a load.
  • Never use a sling to drag a load.
  • Place the hooks of free legs back onto the master link and take care to ensure that empty hooks do not become accidentally engaged.
  • Never use slings in contact with chemicals or heat without the manufacturers approval.
  • Never use damaged or contaminated slings.
  • On completion of the lift return all equipment to proper storage.

Establish the weight of the load, ensure the lifting method is

suitable and inspect the sling and attachments for obvious

defects. Prepare the landing area making sure the floor is

strong enough to take the load. Follow any specific

instructions from the supplier.

 

Arbil Divisions

  • Arbil
  • Arbil Lifting Gear
  • Arbil Rail
  • Arbil 4x4
  •  

    News Categories

  • Arbil 4×4 (28)
  • Arbil Lifting Gear (30)
  • Arbil Rail (38)
  •  

    News Archives

    The Blue Cube Web Design